View Single Post
Old 11-22-2008, 04:25 PM   #17 (permalink)
Joe in T.O.
3.6 Liter SIDI V6
 
Joe in T.O.'s Avatar
 
Join Date: Oct 2005
Location: Toronto
Drives: 2002 Trailblazer & 1970 GTO Convertible 2007 Ava
Posts: 1,154
Re: GM extends holiday shutdown, may cut production

Quote:
Originally Posted by GMJIM69 View Post
I hate to break to you sad sacks out there but the Arlington TX SUV plant will be blowing and going WITH APPROVED COMPANY OVERTIME in December. This is America where LOW GAS PRICES = HIGH SUV SALES. This came straight from the Arlington TX. GM Plant today so it must be so.
Wow, I am surprised at this. Instead of overtime, why not take a little longer to deliver the vehicles?
Joe in T.O. is offline   Reply With Quote